introduce
The Tarim River Bridge was completed in 1995, with a total length of 605 meters and an approach road of 673 meters. It is the first bridge built for the development of Tarim Petroleum. It is the only bridge leading to the Taklimakan Desert. the demarcation point. The bridge is located in Alar City, Xinjiang Uygur Autonomous Region.
opening hours
Open all year round