• Phoenix
  • Durbert

Phoenix (/ˈfiːnɪks/ FEE-niks; Navajo: Hoozdo; Spanish: Fénix or Fínix,[citation needed] Walapai: Banyà:nyuwá) is the capital and most populous city of the U.S. state

of Arizona, with 1,608,139 residents as of 2020. It is the fifth-most populous city in the United States, and the only U.S. state capital with a population of more than one million residents.

Phoenix is the anchor of the Phoenix metropolitan area, also known as the Valley of the Sun, which in turn is part of the Salt River Valley. The metropolitan area is the 11th largest by population in the United States, with approximately 4.85 million people as of 2020. Phoenix, the seat of Maricopa County, has the largest area of all cities in Arizona, with an area of 517.9 square miles (1,341 km2), and is also the 11th largest city by area in the United States. It is the largest metropolitan area, both by population and size, of the Arizona Sun Corridor megaregion.

Durbert Mongolian Autonomous County, Daqing City, a county (formerly known as Taikang County), is the only animal husbandry base county with Mongolians as the main body in Heilongjiang Province. Jurisdiction over 5 towns and 6 townships. In 2013, there were 4 neighborhood committees and 82 village committees. Durbert is praised as "Green Pure Land and Natural Gem" by EU and domestic green food certification organizations. There are not only prairies, wetlands and other natural landscapes, but also many ancient cultural sites.
Airport In Durbert - Daqing Saertu Airport
Daqing Sartu Airport (Daqing Sartu Airport, IATA: DQA, ICAO: ZYDQ), located at the junction of Sartu District, Daqing City, Heilongjiang Province, China and Anda City, Suihua City, 17.5 kilometers away from the eastern urban area of ​​Daqing City, and west of Daqing City The urban area is 22.5 kilometers away, and it is a 4C-level domestic feeder airport in China   .
In October 2008, the construction of Daqing Sartu Airport started; on September 1, 2009, Daqing Sartu Airport was officially opened to navigation; on June 15, 2019, the construction of the international terminal of Daqing Sartu Airport started   .
According to the official website of the airport in February 2021, the terminal building of Daqing Sartu Airport covers an area of ​​13,987 square meters, with 4 boarding bridges; the civil aviation station has 8 seats, including 1 class B seat and 6 C seats. Class aircraft stand, 1 dedicated deicing stand; the runway is 2,600 meters long and 45 meters wide; it can meet the needs of an annual passenger throughput of 1.47 million and a peak hour of 933 passengers   .
In 2019, Daqing Sartu completed a total of 858,021 passenger throughput, a year-on-year increase of 3.2%, ranking 117th in the country; cargo and mail throughput was 1,324.6 tons, a year-on-year decrease of 6.7%, ranking 111th in the country; aircraft movements took off and landed 6,697 , ranked 148th nationally   .
Travel Guides In Durbert
Travel Sights In Durbert
Travel Notes In Durbert
Travel Asks In Durbert
Travel Asks In Durbert